Draft

The structure is the deliverable. Every headline, paragraph and question on this page is placeholder written to brand voice at realistic length — the promise, the cost list and the two doors need Lourens's words before it goes live. No statistic on this page is ours: the annual figure in the dark band is worked out from numbers the reader types, seeded with a plausible example, and the only fixed price is the real $49 platform one.

Techanisms / Solutions / Quotes take too long Quoting
Quotes take too long

The quote goes out the same day you look at the job

The job is measured on Tuesday. The quote gets written on Sunday night, because that is the first hour nobody wanted. By then somebody else has already sent theirs.

Quotes out — how the week actually goes
Quotes out 9 asked · 2 sent
Asked for a price
Northbound FreightMeasured Tue — not written
Cape InteriorsSitting 6 days
Rand LegalNumbers on a photo
Quote sent
Vaal Plant HireSent day 9 — no answer
Accepted
Summit ElectricalSigned
Nine people asked what it costs. Two got an answer. The other seven are still waiting — and they are not waiting quietly.
Fig. 01 — Without
Illustration. Names and values are examples; the shape is not.
Income Mavericks — quotes out
Quotes out 9 asked · 9 sent
Asked for a price
Rand LegalPriced from the site visit
Quote sent
Northbound FreightSent same day — opened
Vaal Plant HireSent Tue — reminder Fri
Accepted
Summit ElectricalSigned
Cape InteriorsSigned on the phone
Same nine people. Every price went out the day the job was looked at, and none of it happened on a Sunday.
Fig. 01 — With
Illustration. Same names, same week, the writing and the chasing done by the system.
What it is costing you

The bill nobody writes down

A slow quote never looks like a loss. It looks like admin you are behind on. So the cost turns up somewhere else — in the job you priced carefully and never heard about again, in the month that came in under, in the belief that your prices are too high when what was too high was the wait.

And it is not the pricing that takes the time. It is everything around it. You know the number within a minute of seeing the job — the other two hours are finding the last one like it, retyping the address, and remembering what you charged.

And a quote that goes out late does not arrive late. It arrives second. By the time it lands, somebody has already been given a price, and yours is being checked against theirs instead of against the job.

01

You pay for the job twice before you win it

Once to go and look at it, and again on the evening you finally write it up. Both hours are spent whether or not the work comes back, and neither one is billable.

02

The first quote sets the price everyone else argues with

BuildOps puts it plainly: the contractor who sends the estimate first usually wins the job. Someone getting quotes is getting three, and whoever sends first is the number the other two get measured against.

03

You cannot tell whether your prices are right

A quote lost on price and one lost on a nine-day wait come back the same way: silence. So the next thing you adjust is the number, which was never the problem.

Sound familiar

Quoting is the thing you do after hours. If the answer to "did we ever send that one" is opening a folder of last year's documents to find one that was nearly right, this is the page.

Not your problem

If quotes go out the same day and still nothing comes back, the leak is earlier — nobody is asking the ones who went quiet. Try leads go cold instead.

The fix

Income Mavericks writes it while you are still on site

Not a template you open later. The quote itself — your prices, your wording, built from what you picked on the job and sent from your phone before you get back in the van.

Income Mavericks — what changes
Priced on siteBUILDING QUOTE
Northbound Freight6 line items · your rates
Cape Interiors4 line items · ready to send
Quote sentSAME DAY
Vaal Plant HireSent Tue — reminder Fri
Fig. 02 — What changes
You pick the parts and the hours on site. Income Mavericks prices them at your rates, writes the document and sends it — then chases the answer on its own. Illustration; names are examples.
01

Your prices are already in it

The work you do, at the rates you charge, written down once. Building a quote is choosing lines, not remembering what you said last time.

02

It sends from where you are standing

Phone, van, kitchen table. The customer gets the document and can accept it on the screen they read it on — no printing, no scanning, no posting it back.

03

An unanswered quote chases itself

Sent and nothing back becomes a reminder, then one more, on a schedule built around your business. It stops the moment they answer.

In practice

One job, site visit to signature

A Tuesday morning site visit, quoted before lunch. The timings are the shape of a real sequence; names are illustrative.

Site visit → quote accepted · idle2.4s
Site visit finishedTuesday 10:40 · lines picked on the phone
Quote builtYour rates, your terms, totalled
Sent from the van11:05 — before the next job
Not opened by FridayOne reminder, same channel
AcceptedChasing stopped itself
Two ways to get it

Have it built, or run it yourself

We build it

Your price list, turned into a quote that sends

We take your rates, your terms and the way you actually price a job, and build the quote around them. You approve what it says; we own everything behind it. Quoted before it starts.

You run it

The platform it runs on, from $49 a month

Income Mavericks is where the price list, the quotes and the list of who has not answered live. If you would rather set it up yourself, that is the same system without us in it.

Questions

About quoting faster

Every job is different. Will it price them wrong?

It does not price anything. You decide the lines and the number, the same as now — it just stops you rewriting the parts that never change. Nothing sends until you have looked at it.

Some jobs I cannot price until I have seen them

Then the fast thing is the visit, not the quote. What goes out in minutes is the booking and what happens next; the price follows when you have stood in the room. The wait this page is about is the one after that.

We already use a CRM. Does this replace it?

Yes. We build on Income Mavericks and only on Income Mavericks — it is the one platform we know well enough to be accountable for. Your contacts and history come across, and what you are paying your current CRM stops.

How long before it is running?

One quote template and your common lines can be live quickly; a full price list takes as long as it takes to agree the rates. We scope it on the call rather than quote a number here.

Other things that leak

Most businesses have two of these at once, and fixing one usually exposes the next.

One next action

Bring your last five quotes to the call

An hour. We go through what took the time in each one and which parts never needed you.

Book a call